Installation Preparation; Prepare Hot Water Line - GE GLD4468R10SS Installation Instructions Manual

Built-in dishwasher
Hide thumbs Also See for GLD4468R10SS:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Preparation
PREPARE HOT WATER LINE
° The line mag enter from either side, rear or floor within the
shaded area shown in Figure F
• The line mag pass through the some hole as the electrical
cable and drain hose OF.cut on additional
1-1/2" diameter
hole to accommodate
the water line If power cord with plug
is used, water line must not pass through power cord hole
...........
#'
H1-I/2" Dic
ii Shutooff-Hole
,"
_
[\
|
I
.
I
I
'
Valve
Hot_i::::::::::
iiZ'--
From
Cabinet
Cabinet Face--..
\,,,\
Figure F
Water
Line Connection
° Turn off the water supply
* Install a hand shut-off valve in an accessible location, such
as under the sink (Optional. but strongkj recommended
and
mag be required bg local codes 1
, Water connection is on the left side of the dishwasher. Install
the hot water inlet line, using no less than 3/8" copper tubing
Route the line as shown in Figure F and extend forward at
least 19" from rear wall
, Adjust water heater for 120°F to 150°F temperature.
- Flush water line to clean out debris
° The hot water supplg line pressure must be 20-120 PSI
Turn page to begin dishwasher
installation.

Advertisement

Table of Contents
loading

Table of Contents