Exerpeutic 1301 Owner's Manual page 12

Air elliptical
Table of Contents

Advertisement

Tool:
2 Allen Wrenches 6#
Allen Wrench 8#
Multi Hex Tool 13#, 17#, 19#
2. Left/Right Handrails and Foot Bars Installation
Remove two M10x18 Bolts (19), two Ø16xØ10.2x3 Spring Washers (20), two Ø28x5
Washers (21), and two Ø28xØ16.2x0.3 Washers (36). Remove bolts with two 6# Allen
Wrenches provided.
Place the Ø15.8x376 Rotation Rod (22) into the hole of the Main Frame (1). Slide the
Left/Right Handrails (10, 9) onto the Ø15.8x376 Rotation Rod (22) and secure in place with
two M10x18 Bolts (19), two Ø16xØ10.2x3 Spring Washers (20), two Ø28x5 Washers (21),
and two Ø28xØ16.2x0.3 Washers (36) that were removed. Tighten bolts with two 6# Allen
Wrenches provided.
Install four 17# Caps (14) onto the M10x55 Bolts (51) and M10 Nylon Nuts (13) on the both
right and left sides of the Foot Bars (11).
Insert a Ø16x129 Bolt for right Crank (15R) and put the Ø28xØ16.2x0.3 Wave Washer (36)
through the right side of the Foot Bar (11). Put a Ø20xØ13.5 Spring Washer (18) on the
bolt, then pass it through the right Crank (25), and secure the bolt with a 1/2" Nylon Nut for
right Crank (17R). Tighten bolt and nylon nut with the 8# Allen Wrench and Multi Hex Tool
provided. Install two 19# Caps (76) onto both 1/2" Nylon Nuts for right/left Crank
(17R, 17L). Repeat this procedure for the left side assembly.
Please note:
Before you put the 1/2" Nylon Nut for right Crank (17R) and a Ø20xØ13.5 Spring Washer (18)
on the right side of the Foot Bar (11), make sure the Ø16x129 Bolt for right Crank (15R) had
been screwed to the end position with the Right Foot Bar (11).
Attach two Foot Pedal Support Brackets (72) onto both right and left sides of the Foot Bars
(11) with four M8x43 Bolts (73), four Ø8 Washers (74), and four M8 Nylon Nuts (75).
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents