Power Connections And Initial Power On; Figure 14: Slide The Rail Into The Rail Slide - Mellanox Technologies SwitchX MSX1016X-2BFR Hardware User Manual

Switchx 64 port sfp+ ethernet switch
Table of Contents

Advertisement

Rev 1.2
9. Slide the switch into the rails.
10. Tighten the bolts to 9.2 Nm or 81.5 pound inches.
11. Put the switch into place and screw the bolts into the nuts. Tighten the bolts to 9.2 Nm or 81.5
pound inches.
12. Ground the switch.
13. Plug in the power cables.
14. Check the Status LEDs and confirm that all of the LEDs show status lights consistent with
normal operation.
immediately.
It can take up to 5 minutes to boot up, during which time the status LED may indicate
red.
15. You can start connecting all of the cables to the switch.
4.1.2

Power Connections and Initial Power On

Each PSU has a separate AC receptacle. The input voltage is auto-adjusting for 90 - 264 VAC,
50-60Hz power connections. The power cords should be standard 3-wire AC power cords includ-
ing a safety ground and rated for 15A or higher.
26
Mellanox Technologies

Figure 14: Slide the Rail into the Rail Slide

This side of the rail kit goes on the side of the rack you will
slide the switch into. This is the same side of the switch that
will be next to the vertical support.
Warning: Any yellow or red status LEDs are cause for concern and must be dealt with
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx msx1016x-2brr

Table of Contents