Battery Cabinet Installation
18
Entrance Panel
Battery Cable
Figure 13. UPS Power Entrance Panel
3. Use a pair of pliers to bend the narrow links (1 and 2 in
Figure 14) between the outer edge of the lower breakaway
panel and the rear panel.
4. Use the pliers to bend the entire breakaway panel (at 3 and 4 in
Figure 14) until it breaks away.
Figure 14. Breakaway Panel Links
5. Verify all hazardous voltages have been removed from the
backplane by testing with a voltmeter or other test device.
1
4
3
2
Powerware
9170 User's Guide
®
:
www.powerware.com