Powerware 9170 User Manual page 17

3kva-18kva, 50 and 60 hz
Hide thumbs Also See for 9170:
Table of Contents

Advertisement

Powerware
9170 User's Guide
®
Tab Slots
Figure 9. Metal Clip-Nut and Tab Slot Locations
5. Install a rack-mount ear (2 for 6-slot cabinets) on each side of
the UPS cabinet (see Figure 10).
Insert the two offset tabs on the rear edge of the ear into the
matching tab slots on the cabinet side frame (see Figure 9).
Pivot the ear forward, until it is flush against the UPS cabinet
side frame. Secure each ear with three 1/4-20
Phillips-head bolts, screwed into the metal clip-nuts installed in
Step 4.
Rack-Mount Ear
6. Select the position for the UPS in the equipment rack.
Ç
7. Install one equipment rail on each side of the rack using four
2
10-32
1/2
flat-head screws per rail. Select the proper holes in
the rail that position the UPS at the desired location in the rack
(see Figure 11).
:
www.powerware.com
Figure 10. Rack-Mount Ear Installed
Installation Setup
Metal Clip-Nuts
Ç
2
1/2
13