Configuring The Inlet Supplies - Mira Extreme Thermostatic Installation And User Manual

Thermostatic power shower
Hide thumbs Also See for Extreme Thermostatic:
Table of Contents

Advertisement

2. Configuring the Inlet Supplies

The Mira Extreme is supplied with blanking plugs fitted to all four ports of the inlet
manifold. The pipework configuration will determine which blanking plugs and case
inserts supplied must be fitted to the case.
Use the table below for reference.
Supply Pipework
Top Entry Inlet
Bottom Entry Inlet
Wall Entry Inlet
The Mira Extreme allows for electrical cable entry from the top, bottom or back of
the case. For top and bottom entries a thinned section of the case, covering the top
or the bottom cable channel, must be removed before the cable can be fitted.
Full Case
Insert
Full Case
Insert
Half Case
Insert
Inlet Manifold Ports
Fit blanking plugs to bottom
ports of the inlet manifold.
Fit blanking plugs to top ports
of the inlet manifold.
Fit blanking plugs to bottom
ports of the inlet manifold.
Half Case
Insert
17
Case Inserts
Fit half insert in the top inlet of
the case. Fit full insert in the
bottom inlet of the case.
Fit full insert in the top inlet of
the case. Fit half insert in the
bottom inlet of the case.
Fit full insert in the top inlet of
the case. Fit full insert in the
bottom inlet of the case.
Thinned Section
of Case
Top Cable
Channel
Bottom Cable
Channel
Thinned Section
of Case

Advertisement

Table of Contents
loading

Table of Contents