Fixing To The Wall - Ferroli SYS 10-23 Installation, Maintenance And User Instruction

Wall-hung, gas-fired, system boiler, for central heating
Table of Contents

Advertisement

Sys 10 - 23
A

Fixing to the wall

Select suitable mounting position for boiler. Using the template mark flue outlet and boiler mounting
points. Drill two 10mm holes 90mm deep to accept the wall plugs. Fit two special wall plugs in the wall
as described in the fig. 3. Fasten the wall bracket to the wall using an antitheft nut on the right side and
a standard nut (M8) on the left side. Using a core drill cut a 118mm diameter hole for the flue. Mount
the boiler on the wall bracket and fix using an antitheft nut on the left side and a standard nut (M8) on
the right side.
Ø118
A
fig. 3
Table 3
Minimum
30 mm
A
200 mm
B
280 mm
C
15 mm
D
(from opening panels)
NOTE: M
inimum distance required from front
panel of the appliance for servicing 600mm (D)
fig. 2
Recommended
150 mm
300 mm
300 mm
> *600 mm
7

Advertisement

Table of Contents
loading

Table of Contents