Yamaha YZ250(P)/LC Owner's Service Manual page 302

Yz series
Table of Contents

Advertisement

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
4. Install:
9
Bolt (shift guide) 1
EC4C5310
Shift shaft
1. Install:
9
Roller 1
9
Plain washer 2
9
Shift shaft 3
NOTE:
Apply the transmission oil on the roller and shift
shaft.
EC4C5601
Kick axle assembly
1. Install:
9
Kick gear 1
9
Plain washer 2
9
Circlip 3
9
Ratchet wheel 4
9
Spring 5
9
Plain washer 6
9
Circlip 7
To kick axle 8.
NOTE:
9
Apply the transmission oil on the kick gear
inner circumference.
9
Align the punch mark a on the ratchet wheel
with the punck mark b on the kick axle.
2. Install:
9
Torsion spring 1
To kick axle 2.
NOTE:
Make sure the stopper a of the torsion spring
fits into the hole b on the kick axle.
4-45
ENG
10 Nm (1.0 m•kg, 7.2 ft•lb)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz250lcYz250p1Yz250pYz250

Table of Contents