Example Configuration 5: 5Kva, N+N Redundant Enclosure With 16A 3-Phase Pdu - HP Cluster Platform Introduction v2010 Installation Manual

Hp cluster platform workgroup system tower hardware installation guide
Hide thumbs Also See for Cluster Platform Introduction v2010:
Table of Contents

Advertisement

Figure A-5 Example Configuration 5: 5kVA, N+N Redundant Enclosure with 16A 3-Phase PDU,
C20-C13 Power Cords (not supplied by HP)
2
1
2
5
The following list describes the callouts in
1.
Workgroup System Tower rear view
2.
1200W power supplies (six)
3.
Six C20-C13 power cords (not supplied by HP)
4.
16A 3-phase PDU, AF513A
5.
PDU power cord to site power
Figure A-6
provides an example of a 5kVA, N+1 redundant enclosure with 16A 3-phase PDU,
and C20-C13 Power Cords (not supplied by HP).
36
Workgroup System Tower High-Line Power Examples
3
3
3
3
3
4
3
Figure
A-5: