Power Examples - HP Cluster Platform Introduction v2010 Installation Manual

Hp cluster platform workgroup system tower hardware installation guide
Hide thumbs Also See for Cluster Platform Introduction v2010:
Table of Contents

Advertisement

2.3 Power Examples

There are several power issues to consider before installing a Workgroup System Tower. HP
recommends using the HP BladeSystem Power Sizer tool to determine the potential power draw
for a Workgroup System Tower configuration. Go to:
http://h71019.www7.hp.com/ActiveAnswers/cache/347628-0-0-0-121.html
HP also recommends that you consult with your HP sales representative who should be familiar
with the HP BladeSystem Power Sizer tool and also review the various power examples available.
Refer to the Workgroup System Tower QuickSpecs for recommendations for wall outlet power
cords.
For several high-line power examples, see
Caution:
When connecting directly to wall outlets, customers should determine the maximum amperage
of the wall outlet circuit to prevent power overload.
Important:
HP recommends that you consult a trained professional for all power options, including wall
outlet source, as a fully loaded Workgroup System Tower might exceed the maximum power
available from a standard wall outlet socket, especially in locations with only low-line power
available.
22
Workgroup System Tower Pre-installation Procedures
Appendix
A.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cluster Platform Introduction v2010 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cluster platform

Table of Contents