• Follow all local codes and ordinances.
Step 8
Drain Line Preparation
Install
• The dishwasher is supplied with a 78" long
Drain Line
• If the location requires a longer drain hose,
Note: Total drain hose length must not exceed 10 feet for
proper drain operation.
Drain Line Installation
• Connect drain line to air gap, waste tee or
disposer using either method 1 or 2 as
previously determined.
• Secure connection using appropriate
clamps (not supplied).
• Make sure drain hose is not kinked.
Note: Remove drain plug before connecting to disposer.
Dishwasher cannot drain if plug is left in place.
Step 9
Connect
Electrical
(For direct
connection to
house wiring)
Verify that power is turned off at the source.
• Install a strain relief onto the junction box
• Strip 1/2" insulation from end of incoming
• Use wire nuts of appropriate size and con-
• Push all wires into the junction box and
corrugated drain hose.
add up to 42" length to the supplied hose.
Use 3/4" inside diameter hose and thin
wall copper coupler to join the hose ends.
WARNING
If house wiring is not 2-wire with a
ground wire, a ground must be provided
by the installer. When house wiring is
aluminum, be sure to use U.L. listed
anti-oxidant compound and aluminum-
to-copper connectors.
AVERTISSEMENT
Si le circuit de la maison n'a pas deux
fils, plus un fil de terre, l'installateur
doit installer un fil de terre. Quand les
fils de la maison sont en aluminium, il
faut prendre soin d'utiliser une pâte
anti-oxydante et des connecteurs
aluminium à cuivre sur la liste UL.
and tighten against the incoming wires.
wires.
nect white to white, black to black and
incoming ground to green wire.
place on dishwasher frame. Secure with
screws "F".
Installation
Stainless Steel Interior Dishwasher
Method 1 – Air Gap with Waste Tee or Disposer
Waste Tee Installation
Method 2 – High Drain Loop
with Waste Tee or Disposer
Fasten to underside
of countertop
30"
Min.
12"
Min.
Waste Tee Installation
Screw F
Disposer Installation
Fasten to underside
of countertop
30"
12"
Min.
Min.
Disposer Installation
13