Loading Documents on the ADF
NOTICE
Be sure to change the position of the shipping lock according to "INSTALLATION AND
CONNECTION" procedure before operation.
ADF
Lift the ADF paper chute up and
1
place the shaft in its operating
position.
3-4
Operating position
Bar
ADF paper chute
Guide
Guide lever
ADF lever
Stacker