Figure 5-15. Access.bus Data Transaction; Figure 5-16. Access.bus Acknowledge Cycle - AMD Geode SC2200 Data Book

Processor
Table of Contents

Advertisement

32580B
5.7.3
Acknowledge (ACK) Cycle
The ACK cycle consists of two signals: the ACK clock pulse
sent by the master with each byte transferred, and the ACK
signal sent by the receiving device (see Figure 5-15).
The master generates the ACK clock pulse on the ninth
clock pulse of the byte transfer. The transmitter releases
ABD
ABC
Start
Condition
Data Output
by Transmitter
Data Output
by Receiver
ABC
128
MSB
2 3 - 6
1
7
S
Byte Complete
Interrupt Within
Receiver

Figure 5-15. ACCESS.bus Data Transaction

2 3 - 6
1
S
Start
Condition

Figure 5-16. ACCESS.bus Acknowledge Cycle

the ABD line (permits it to go high) to allow the receiver to
send the ACK signal. The receiver must pull down the ABD
line during the ACK clock pulse, signalling that it has cor-
rectly received the last data byte and is ready to receive the
next byte. Figure 5-16 illustrates the ACK cycle.
Acknowledge
Signal From Receiver
8
9
1
2
3 - 8
ACK
Clock Line Held
Low by Receiver
While Interrupt
is Serviced
Transmitter Stays Off Bus
During Acknowledge Clock
Acknowledge
Signal From Receiver
7
8
9
AMD Geode™ SC2200 Processor Data Book
SuperI/O Module
9
P
ACK
Stop
Condition

Advertisement

Table of Contents
loading

Table of Contents