Trane R Series Installation Operation & Maintenance page 82

R series rotary liquid chillers water-cooled and condenserless
Table of Contents

Advertisement

82
Installation - Electrical
terminal strip in the power section of the control panel, if applicable.
Connect power supply wiring to the chilled water pump and condenser
water pump, if applicable.
Connect power supply wiring to the RTCA fans, if applicable.
Check Interlock Wiring, including External Auto/Stop (terminals 1U1TB3-3
and -4), UCM Pump Control Contacts (terminals 1U1TB4-8 and -9) and
Proof of Chilled water Flow Interlock (terminals 1U1TB3-1 and -2), if appli-
cable.
If the remote running/alarm indicator contacts are used, install leads 525
thru 531 from the panel to the proper terminals on terminal strip 1U1,
TB4.
If the emergency stop function is used, remove the factory-installed
jumper and install low voltage leads 513 and 514 to terminals 3 and 4 of
1U1, TB1.
If indoor zone temperature is to be used, install leads 501 and 502 on
6RT4 to the proper terminals on 1U2, TB1.
If the ice making option is used, install leads 501 and 502 on 5K20 to the
proper terminals on 1U2, TB1.
If the Remote Clear Language Display is used, install the 24 VAC cus-
tomer-supplied transformer to the proper terminals on J2. Also connect
the twisted-pair wires from the 1U7 module in the unit to the proper ter-
minals in the Remote Clear Language Display panel.
On RTUA units, connect all low voltage wiring between RTUA and air-
cooled condenser.
RLC-SVX07A-EN