™ Series R Helical Rotary Liquid Chillers Model RTHD 175-450 T ons (60 Hz) 125-450 T ons (50 Hz) Built for Industrial and Commercial Applications RLC-PRC020-EN June 2006...
RLC-PRC020-EN Contents Introduction Features and Benefits Options Controls Application Considerations Selection Procedure Model Nomenclature General Data Electrical Data and Connections Dimensions and Weights Mechanical Specifications Conversion T able...
Simple, Economical Installation • Compact size makes the model RTHD well suited for the retrofit and replacement market. • All units fit through standard double- width doors.
Page 5
• The RTHD features a complete range of chiller safety controls. • Over 120 diagnostic and operating points are available, with standard...
Unit is shipped with a nitrogen holding charge in lieu of refrigerant. Seal Kit for Reassembly Ideal for situations when the bolt-together construction of the RTHD will be separated for installation, this seal kit provides replacement gaskets and rings for reassembly.
Page 7
RLC-PRC020-EN Options Control Options: Tracer Summit Communications Link to factory-installed, tested communication board, via single twisted- pair wiring, adds Tracer Summit communications to the system. LonT alk LCI-C Interface LonTalk (LCI-C) communications capabilities are available, with communication link via single twisted-pair wiring to factory-installed, tested communication board.
LCD Touch-Screen Display with Multi-Language Support The standard DynaView display provided with the CH530 control panel features an LCD touch-screen, allowing access to all operational inputs and outputs. This display supports eleven languages: English, Chinese, Dutch, French, German, Italian, Japanese, Korean, Portugese, Spanish and Thai.
Page 9
Regulatory Compliance Documentation Comprehensive documentation of refrigerant management practices is now a fact of life. Trane chiller plant automation generates the reports mandated in ASHRAE Guideline 3. Keeping Operators Informed A crucial part of efficiently running a...
Some basic rules should be followed whenever using these system design and operational savings methods with the RTHD. The proper location of the chilled water temperature control sensor is in the supply (outlet) water. This location allows the building to act as a buffer, and it assures a slowly changing return water temperature.
Page 11
Acoustic Considerations For chiller sound ratings, installation tips, and considerations on chiller location, pipe isolation, etc., refer to the Trane Water-Cooled Series R Chillers Sound Ratings and Installation Guide . Using the information provided in this bulletin,...
Selection Procedure Trane Series R chiller performance is rated in accordance with the ARI Standard 550/590-2003 Certification Program. Chiller selection assistance and performance information can be obtained by using the Series R chiller selection program, available through local Trane sales offices.
Page 13
When considering selection of media other than water, contact the local Trane sales office for chiller selections and factory performance testing information. Fluid media other than water lowers the heat transfer coefficient, and therefore reduces chiller performance.
RTH D 1,2,3 4 10,11 ™ Digits 01, 02, 03 – Series R RTH = Series R Digit 04 – Dev Sequence D = 4th Major Development Digit 05 – Design Control U = WCBU Digit 06 – Compressor Frame B = B Compressor C = C Compressor D = D Compressor...
Page 15
28 29 33 34 35 Digit 28 – Condenser Leaving Water Temperature A = Standard Digit 29 – Refrigerant Specialties X = No Refrigerant Isolation Valves V = With Refrigerant Isolation Valves Digit 30 – Oil Cooler X = Without Oil Cooler C = With Oil Cooler Digit 31 –...
225-275 Tonnage (50 Hz) 125-150 150-175 175-225 Notes: 1. Chiller selections can be optimized through the use of the ARI-Certified Series R selection program and by contacting your local Trane sales office. Evaporator Condenser Water Storage Water Storage Gallons Liters...
2. The RLA @ Max kW is based on the performance of the motor developing full rated horsepower. 3. Electrical component sizing should be based on actual jobsite operating conditions. This factor can be obtained through the use of the Series R chiller selection program available through local Trane sales offices. Compressor Motor Electrical Data (50 Hertz)
Page 20
Electrical Data and Connections RLC-PRC020-EN...
Page 21
Electrical Data and Connections RLC-PRC020-EN...
Dimensions and Weights Shipping and Operating Weights Compressor Evaporator Condenser Code Code Code D2, D3 D2, D3 D2, D3 D2, D3 Notes: 1. All weights +- 3%. 2. Shipping weights include standard 150 psig water boxes, refrigerant charge, and oil charge. 3.
Page 23
RLC-PRC020-EN Dimensions and Weights BBB Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 108" (2743 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1. Dimensions are based on 3 Pass Evap / 2 Pass Cond and LH/LH water connections.
Page 24
Dimensions and Weights BCD Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 126" (3200 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1. Dimensions are based on 3 Pass Evap / 2 Pass Cond and LH/LH water connections.
Page 25
RLC-PRC020-EN Dimensions and Weights CDE, DDE, EDE Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 108" (2743 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1. Dimensions are based on 3 Pass Evap / 2 Pass Cond and LH/LH water connections.
Page 26
Dimensions and Weights CEF Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 126" (3200 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1. Dimensions are based on 3 Pass Evap / 2 Pass Cond and LH/LH water connections.
Page 27
RLC-PRC020-EN Dimensions and Weights CFF , DFF , EFF Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 126" (3200 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1.
Page 28
Dimensions and Weights DGG, EGG Configuration Recommended Clearances Front 36" (914 mm) Back 36" (914 mm) Either End 36" (914 mm) Other End* 126" (3200 mm) T op 36" (914 mm) * Clearance for tube removal Note: 1. Dimensions are based on 3 Pass Evap / 2 Pass Cond and LH/LH water connections.
• a hard-wired 4-20 mA or 2-10 VDC signal from an external source (interface optional; control source not supplied) • Generic BAS (optional points; control source not supplied) • LonTalk LCI-C (interface optional; control source not supplied) • Trane Tracer Summit ™ system (interface optional)
Page 32
Literature Order Number RLC-PRC020-EN File Number PL -RF-RLC-000-PRC020-EN-0606 Supersedes RLC-PRC020-EN-00406 Stocking Location Inland Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice.
Need help?
Do you have a question about the RTHD and is the answer not in the manual?
Questions and answers