Routine Maintenance; Suggested Preventive Maintenance Schedule - Teledyne 6020 Operating Instructions Manual

Photometric analyzer
Table of Contents

Advertisement

3 Maintenance
3.
Verify that the chart recorder contains a normal display.
4.
Verify that the recorder has a sufficient supply of chart paper and
ink.
3.3
Keep the sample lines and components, including the measuring cell
within the analyzer sample module, free of deposits and leaks. You must
determine the interval between cleaning procedures empirically, because the
duration of time that the system runs without attention is related directly to the
sample's condition.
3.4
DAILY (these suggestions are perinent to your particular system
design)
1.
Visually inspect the complete system for obvious defects, such
as leaking tubes or connectors.
2.
Verify that the sample pump (if applicable) is running.
3.
Verify that the signal failure alarm is not in failure condition.
4.
Verify that zero and span settings are correct.
WEEKLY
1.
Examine sample cell windows for accumulation of solids.
Remove and clean as necessary.
2.
Calibrate the system.
ANNUALLY
1.
Check the electronics calibration.
3-2
Part II

Routine Maintenance

Suggested Preventive Maintenance
Schedule
Teledyne Analytical Instruments
Model 6020

Advertisement

Table of Contents
loading

Table of Contents