Installation; Unpacking The Control Unit; Electrical Connections - Teledyne 6020 Operating Instructions Manual

Photometric analyzer
Table of Contents

Advertisement

Photometric Analyzer
Installation of Model 6020 Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of the
Analysis Unit is covered in Part II of this manual.
2.1
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping
agenFigure 2-2: Required Front Door Clearance
Allow clearance for the door to open in a 90-degree arc of radius 15.5
inches. See Figure 2-2.
2.2
Figure 2-3 shows the Control Unit interface panel. Connections for
power, communications, and both digital and analog signal outputs are
described in the following paragraphs. Wire size and maximum length data
appear in the Drawings at the back of this manual.

Installation

the Analysis Unit

Unpacking the Control Unit

Electrical Connections

Teledyne Analytical Instruments
Part I: Control Unit
Figure 2-2: Required Front Door
Clearance
Part I: 2-1