Fujitsu TeamPoS 3600 Series Installation & Maintenance Manual page 78

Table of Contents

Advertisement

Team
PoS
3600 Series
5. Remove the nine screws that connect the motherboard to the chassis.
Remove
these 9
screws
Note: Depending on your maintenance procedures, it may be necessary to remove the CPU,
heat sink, memory and/or PCI cards from the old motherboard and reinstall on the new
motherboard. See appropriate sections of this chapter for removal and replacement
instructions.
Note: When replacing the CPU, do not reuse the existing heat sink without having proper heat
sink compound for heat dissipation. Otherwise damage to CPU could result.
Note: When holding Motherboard, please hold the edge of PCB. Please don't touch any
component on Motherboard.
6. Insert the replacement board onto the chassis and secure with nine screws.
D900000338
Issue 3
Maintenance
7-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents