HP StorageWorks 8B - FC Entry Switch Getting Started Manual page 19

Fc 1gb/2gb entry switch 8b and fc 1gb/2gb switch 8b
Hide thumbs Also See for StorageWorks 8B - FC Entry Switch:
Table of Contents

Advertisement

Installing the Switch
3. Attach the rear rail-tray brackets to the rear rack uprights by assembling
each of the two brackets with two spacers, two M5 flat washers, and one
M5 Torx head screw with captive lock washer as shown in
The alignment pins will be resting on the top surfaces of the spacers.
Note
Figure 9. Installing the Rear Rail-Tray Brackets
4. Install two #10-32 square Tinnerman nuts for each of the front columns
of the rack in the top and bottom positions of the three-hole EIA pattern.
Also install one spacer in the center position for each column on the front
of the rack. See
Figure
10.
Figure
9.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surestore fc seriesStorageworks fc entry switch 8b

Table of Contents