12
Figure 8. Securing the Switch
9. Provide power to the switch by connecting the power cord to the switch
power supply and to a power outlet. Ensure the power cord is routed so
that it is not exposed to stress. Power is supplied to the switch as soon as
the cord is connected. The switch runs POST (power on self-test) by
default each time it is turned on.
Do not connect the switch to the network until the IP address is
Note
correctly set. For instructions on how to set the IP address, see
"Configuring and Connecting the Switch"
To install the switch in a Compaq/Rittal rack:
1. Check contents of the shipping carton to verify all the required parts and
hardware are available.
2. Choose a mounting location in the rack for the switch.
on
page
23.
Getting Started Guide
Need help?
Do you have a question about the StorageWorks 8B - FC Entry Switch and is the answer not in the manual?
Questions and answers