Internal Blower (Horizontal Ducting) - Zephyr CACHE CCA-E36ASX Use, Care And Installation Manual

Cheng collection
Hide thumbs Also See for CACHE CCA-E36ASX:
Table of Contents

Advertisement

INTERNAL
BLOWER
PREPARATION
- HORIZONTAL
DUCTING
1. Attach capacitor box to inside of hood using two
M4"10 screws included with internal blower.
2. Attach green ground wire to ground screw on
hood.
I
im
,,1=,1
m
3. Connect 6 pin male connector from capacitor
box to 6 pin female connector on control board
box.
5. Remove rectangular cap from back of hood.
Place six M4"8 screws aside for later use.
4.
Place solid mounting plate on top of hood and
secure using eight M4"8 screws.
Attach blower brackets to blower as shown above
using two M3.5"10 screws for each bracket.
There are two brackets total, one for each side of
the blower. NOTE: Drilled flange of both blower
brackets faces away from the blower casing.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CACHE CCA-E36ASX and is the answer not in the manual?

This manual is also suitable for:

Cache cca-e30asxCache cca-e48asx

Table of Contents