INTERNAL
BLOWER
PREPARATION
- VERTICAL
DUCTING
I
1. Attach capacitor box to inside of hood using two
M4"10 screws included with internal blower.
,_
3. Connect 6 pin male connector from capacitor box
to 6 pin female connector on control board box.
m
m
2. Attach green ground wire to ground screw on
hood.
4. Place 6" round mounting plate on top of hood
and secure using eight M4"8 screws.
5. Install internal blower into hood.
6. Secure internal blower to hood using four
M4"16 screws included with internal blower.
Need help?
Do you have a question about the CACHE CCA-E36ASX and is the answer not in the manual?