TOOLS
REQUIRED
FOR ASSEMBLY
(!)
(2)
(2)
(2)
(2)
(2)
(1)
Standard Screwdriver
15/16" Wrenches (one should be box-end)
3/4" Wrenches
9/16" Wrenches
1/2" Wrenches
7/16" Wrenches
3/8" Wrench
ADDITIONAL
ITEMS NEEDED
Ruler or Tape Measure
Grease
REMOVE
PARTS FROM CARTON
•
Remove the hardware pack and all loose parts from
the carton.
Lay cardboard on floor to help prevent scratching of
painted parts.
5/16" WASHERS
(EE)
5/16"
NYLOCK
NUT (T)
3/8" x 1=1/4"
/-
HEX BOLT (D)
3/8" NYLOCK NUT (R)
3/8" HEX NUT (e)
Lay out and identify all the parts and hardware as
shown on pages 4 through 6.
FIGURE 1
ASSEMBLE
SCOOP
STEP 1 : iNSTALL TWO BOLTS
(SEE FIGURE 1)
•
Assemble two 3/8" x 1-1/4" hex bolts (D) and 3/8" hex
nuts (Q), threading the nut all the way onto the bolt
until it is tight against the head of the bolt.
Install a nut/bolt assembly into the bucket assembly
and fasten using a 3/8" nylock nut (R). Tighten.
Repeat for the other side.
STEP 2: iNSTALL PiN STOP BRACKET
(SEE FIGURE 1)
•
Install the pin stop bracket to the top of the bucket
assembly using four 5/16" x 1" hex bolts (F), eight
5/16" washers (EE) and four 5/16" nylock nuts (T).
Leave the bolts loose enough that the position of the
pin stop bracket can be adjusted later.
STEP 3: INSTALL LiFT FRAME ASSEMBLY
(SEE FIGURE 2)
•
Apply grease to the mounting surface of the bucket
assembly and the inside of the lift frame arms.
Assemble the lift frame assembly to the bucket
assembly using two 5/8" x 1-1/2" hex bolts (A) and
5/8" nylock nuts (M). Tighten, then loosen the nuts
1/4 turn, or until the lift frame pivots freely.
5/8" x 1=1/2"
HEX BOLT (A)
APPLY
GREASE
/-
5/8" NYLOCK
NUTS (M)
APPLY
LIFT FRAME
GREASE
ASSEMBLY
-/
5/8" x 1=1/2"
HEX BOLT (A)
APPLY GREASE
FIGURE 2