Features
1.1 Features
1.2 Introduction
1-2
Full - featured evaluation board for a variety of single channel, eight pin Mi-
cro SOP, 12 and 16-bit, serial Output, analog to digital converters
On-board reference and buffer circuits
High-speed serial interface
Modular design for use with a variety of DSP and micro controller interface
s
board
The Modular MSOP8 Evaluation Module is an updated version of the
Burr-Brown DEM-MSOP8 evaluation board. The EVM is designed so that a
single printed wiring board (PWB) supports a variety of high speed 12 and 16
bit serial ADC's.
The modular EVM form factor allows for direct evaluation of the ADC's
performance and operating characteristics. This EVM is compatible with the
5 - 6K Interface Board (SLAU104) from Texas Instruments and additional 3
party boards such as the HPA449 demonstration board from SoftBaugh, Inc.
(www.softbaugh.com) and the Speedy33t from Hyperception, Inc.
(www.hyperception.com).
rd
Need help?
Do you have a question about the Modular MSOP8 EVM and is the answer not in the manual?
Questions and answers