About This Manual
How to Use This Manual
Information About Cautions and Warnings
This user's guide describes the characteristics, operation, and use of the
Modular MSOP8 EVM. This EVM is a multi-device, 12 to 16 bit, SSI, analog
to digital converter Evaluation Module. A complete circuit description, as well
as schematic diagram and bill of materials, are included.
This document contains the following chapters:
Chapter 1—EVM Overview
Chapter 2—Analog Interface
Chapter 3—Digital Interface
Chapter 4—Power Supplies
Chapter 5—EVM Operation
Chapter 6—EVM Bill of Materials and Schematic
This book may contain cautions and warnings.
This is an example of a caution statement.
A caution statement describes a situation that could potentially
damage your software or equipment.
This is an example of a warning statement.
A warning statement describes a situation that could potentially
cause harm to you.
Preface
Read This First
Read This First
-3
Need help?
Do you have a question about the Modular MSOP8 EVM and is the answer not in the manual?
Questions and answers