The Modular MSOP8 EVM board requires 5 V dc for the analog section. This
includes the voltage reference (U2), the reference buffer (U4), and optionally,
the ADC installed on the EVM (via JMP1). Supply voltages of 1.8 V to 5 V dc
for the digital section are also required. When used in combination with one
of the DAP Interface boards, J3 provides connection to the common power bus
described in document SLAU104. Table 4 - 1 shows the pin out of J3.
Table 4 - 1. Power Supply Pin Out
Unused
+5VA
DGND
+1.8VD
+3.3VD
When power is supplied to J3, JMP3 allows for one of four different dc voltages
to be applied to the digital sections of the ADC. See the schematic and PWB
silkscreen for details.
Topic
4.1
4.2
4.3
Signal
Pin Number
ADC Power
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stand Alone Operation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Reference Voltage
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 4
Power Supplies
Signal
1
2
Unused
3
4
Unused
5
6
AGND
7
8
+VD1
9
10
+5VD
Power Supplies
Page
4-2
4-2
4-2
4-1
Need help?
Do you have a question about the Modular MSOP8 EVM and is the answer not in the manual?