It is important to operate this EVM within the input voltage range of 1.8 VDC to 5 VDC and the
output voltage range of 0 VDC and 5 VDC.
Exceeding the specified input range may cause unexpected operation and/or irreversible
damage to the EVM. If there are questions concerning the input range, please contact a TI
field representative prior to connecting the input power.
Applying loads outside of the specified output range may result in unintended operation and/or
possible permanent damage to the EVM. Please consult the EVM User's Guide prior to
connecting any load to the EVM output. If there is uncertainty as to the load specification,
please contact a TI field representative.
During normal operation, some circuit components may have case temperatures greater than
30°C. The EVM is designed to operate properly with certain components above 85°C as long
as the input and output ranges are maintained. These components include but are not limited
to linear regulators, switching transistors, pass transistors, and current sense resistors. These
types of devices can be identified using the EVM schematic located in the EVM User's Guide.
When placing measurement probes near these devices during operation, please be aware
that these devices may be very warm to the touch.
Copyright  2003, Texas Instruments Incorporated
EVM WARNINGS AND RESTRICTIONS
Mailing Address:
Texas Instruments
Post Office Box 655303
Dallas, Texas 75265

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Modular MSOP8 EVM and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Modular msop8

Table of Contents