Considerations Prior To Installation; Required Tools; Unpacking The Switch; Contents Of Switch Carton - Enterasys C2K122-24 Hardware Installation Manual

Enterasys gigabit ethernet switch installation guide
Hide thumbs Also See for C2K122-24:
Table of Contents

Advertisement

Considerations Prior to Installation

Considerations Prior to Installation

When installing the switch, note the following:
Before starting the installation procedure, notify the network administrator of the 
installation.
Follow the installation procedures in the order as presented in this guide. 
Do not connect the switch to the network until you have established the correct IP 
address.

Required Tools

A Phillips screwdriver is required to install the switch into a rack.

Unpacking the Switch

Unpack the switch as follows:
1.
Open the carton and remove the packing material protecting the switch.
2.
Verify the carton contents with the items listed in Table
Table 3-1 Contents of Switch Carton
Item
Switch device
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting)
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country dependent.)
This installation guide
Customer Release Notes
URL notice card
3.
Remove the tape seal on the non‐conductive bag to remove the switch.
4.
Perform a visual inspection of the switch for any signs of physical damage. Contact 
Enterasys Networks if there are any signs of damage. Refer to "Getting Help" on 
page 1‐5 for details.
3-2 Hardware Installation
3‐1.
Quantity
1
1
4
1
1
1
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack c2 c2k122-24

Table of Contents