Rack Mounting The Switch; Area Guidelines For Switch Installation On Flat Surface - Enterasys C2K122-24 Hardware Installation Manual

Enterasys gigabit ethernet switch installation guide
Hide thumbs Also See for C2K122-24:
Table of Contents

Advertisement

The next step to install the switch is dependent on the type of installation. If installing 
several switches in a stack, proceed to "Connecting High‐Speed Stacking Cables" on 
page
RPS Power" on page 3‐13 for power connection instructions.
Figure 3-3
1 Approximately 152 cm (5 ft) from power source
2 4.45 cm (1.75 in.) per switch. (Vertical clearance
depends on number of switches stacked.)

Rack Mounting the Switch

To install the switch in a 19‐inch rack, you need: 
Two rackmount brackets and mounting screws (rackmount kit) shipped with the 
switch.
Four user‐supplied screws to attach the switch to a standard 19‐inch rack.
Caution: To ensure proper ventilation and prevent overheating, leave a minimum
clearance space of 5.1 cm (2.0 in) at the left, right, and rear of the switch.
Do not connect the switch to the AC power source until instructed to do so later in the
installation process.
Precaución: Para asegurar una buena ventilación y evitar que el sistema se
sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y
a la parte posterior del aparato.
3‐9. If installing the switch as a standalone device, proceed to "Connecting AC and 

Area Guidelines for Switch Installation on Flat Surface

À
Ã
Rack Mounting the Switch
Â
3 44.5 cm (19.4 in.) for proper ventilation
4 419.0 cm (16.5 in.) for proper ventilation
SecureStack C2 Installation Guide 3-7