Adjustment; Timing Belt Tension Adjustment; Test Mode; Pre-Operation - Epson EPL-N2700 Service Manual

Optional units
Hide thumbs Also See for EPL-N2700:
Table of Contents

Advertisement

EPL-N2700 Optional Units

5.3 Adjustment

5.3.1 Timing Belt Tension Adjustment

Perform Timing Belt Tension Adjustment when the Transport Motor has
been removed or the timing belt listed below has been replaced. Make
sure the belt lowers the correct amount with the specified load.
Table 5-1. Timing Belt Tension Adjustment
Belt to be adjusted
Timing belt (A) for driving the pulley 64T
Timing belt (B) for driving the pulley gear 64/18T
Figure 5-48. Timing Belt Adjustment Points
10-Bin Unit
Lowered
Load
amount
100 - 200 gf
2 mm
200- 300 gf
2 mm
Adjustment

5.3.2 Test Mode

Test Mode allows you to perform the units test of the 10-Bin Unit. You
can check the operational condition of the parts in the drive system as
well as such electrical parts as motors by referring to the LED's on/off
condition.

5.3.2.1 Pre-Operation

Turn the unit power off and remove outer covers. (See Section 5.2.3.1)
When the rear cover is removed, the control panel shown below is
exposed.
Figure 5-49. Control Board
Revision A
132

Advertisement

Table of Contents
loading

Table of Contents