G21LD · G21HD, WSM
(2) Disassembling and Assembling
Upper Lift Link and Rear Link Assembly
1. Pull out the rue ring cotters (3) and plain washers.
2. Remove the upper lift links (4).
3. Pull out the cotter pin (1) and plain washer.
4. Remove the L.H. rear link assembly (2).
5. Remove the R.H. rear link assembly retaining lock nut and bolt.
6. Remove the R.H. rear link assembly.
(When reassembling)
• Apply the grease to the rotary sliding surface.
• Adjust the upper lift link and lower lift link referring to the
"MOWER" section.
IMPORTANT
• Tighten the R.H. rear link assembly lock nut and bolt, leaving
gap between the frame and the lock nut as little as possible.
Also be sure that the rear link assembly turns smoothly.
(Reference)
• L : 350mm (13.8 in.)
(1) Cotter Pin
(2) L.H. Rear Link Assembly
(3) Rue Ring Cotter
6-S23
HYDRAULIC SYSTEM
(4) Upper Lift Link
(5) Lower Lift Link
KiSC issued 08, 2007 A