Adaptec RAID Installation Guide

LED during power-up

During its power-up sequence, the controller passes through the
following states in sequence, as indicated by the LEDs:
Note: The address translation unit (ATU), PCI bridge, and
cache module (if installed) must be configured and
enabled before controller initialization can be completed.
If any of these components are not configured or become
disabled during the Fast Idle phase, the pattern reverts
to the wait pattern of the affected component.

LEDs during controller idle

When no commands are in progress and all bus activity has
ceased, the controller enters the idle state. This is indicated by a
rotating pattern in LEDs 1 through 8.

LEDs during controller active

When the controller is active, the LEDs indicate any of the
following states:
Condition
Memory Mapped
I/O
Bridge
Fast Idle
B-2
LED Display
LEDs 6 and 7 and LEDs 5 and 8 flash alternately
while the controller waits for the host computer to
initialize the ATU on the PCI bus.
LEDs 5 and 7 and LEDs 6 and 8 flash alternately
while the controller waits for the host computer to
initialize its PCI-to-PCI bridge.
After the ATU and PCI bridge have been enabled, the
controller enters a fast idle pattern while waiting for
the controller initialization commands.