Figure 2-3 Preparing To Roll Off The Pallet - HP Integrity rx7620 Installation Manual

Installation guide, seventh edition - hp integrity rx7620 servers
Hide thumbs Also See for Integrity rx7620:
Table of Contents

Advertisement

Unpacking the Server
Unpacking a Racked Server
6. Remove the six bolts from the base that attaches the rack to the pallet. See Figure 2-3.
Figure 2-3
Preparing to Roll Off the Pallet
WARNING
Be sure that the leveling feet on the rack are raised before you roll the rack down
the ramp and any time you roll the rack on the casters. Use caution when rolling the
cabinet off the ramp. A single server in the cabinet weighs approximately 665
pounds. HP strongly recommends that two people roll the cabinet off the pallet.
34
Chapter 2

Advertisement

Table of Contents
loading

Table of Contents