Brocade Communications Systems A7533A - Brocade 4Gb SAN Switch Base Administrator's Manual page 32

Brocade ezswitchsetup administrator's guide v6.1.0 (53-1000607-02, june 2008)
Hide thumbs Also See for A7533A - Brocade 4Gb SAN Switch Base:
Table of Contents

Advertisement

.
3. Verify that the connections displayed on the Device Connection screen are all green.
4. Click Next.
EZSwitchSetup Administrator's Guide
53-1000607-02
The Device Connection screen provides visual feedback as you cable the switch. A green
line indicates that the connection is correct, a red line indicates an invalid connection, and
a blue line indicates a missing connection.
1
1
Position the Fibre Channel cable
2
Install the Fibre Channel cable
FIGURE 16
Installing Fibre Channel Cable to an SFP
The Finish screen is displayed.
Connecting devices and completing the setup
scale: 1/8" = 1"
IO
IO
I
!
3
Brocade switch
2
ra ck
N :
4 in
.
fo r
T IO
/ 6
g th
1 3
T E N
le n
o r
A T
w
m
sc re
5 m
b e
u m
xi m
g to
M a
ti n
u n
m o
3
2
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae370a - brocade 4gb san switch 4/12

Table of Contents