Brocade Communications Systems A7533A - Brocade 4Gb SAN Switch Base Administrator's Manual page 31

Brocade ezswitchsetup administrator's guide v6.1.0 (53-1000607-02, june 2008)
Hide thumbs Also See for A7533A - Brocade 4Gb SAN Switch Base:
Table of Contents

Advertisement

2
Connecting devices and completing the setup
2. Connect Fibre Channel cables from the switch to your host and storage devices. Ensure that
20
I O
I O
I
1
2
I O
I O
I
1
1
Brocade switch
2
Open the SFP bale
FIGURE 15
Installing SFPs
the physical connections are exactly as indicated on the Device Connection screen.
a. Remove any plastic protectors from the Fibre Channel cable ends, and position the cable
connector so that it is oriented correctly.
b. Insert the cable connector into the SFP until it is firmly seated and the latching mechanism
clicks.
!
3
scale: 1/2" = 1"
!
4
3
Position SFP and insert until firmly seated
4
Close the latching bale
A
B
EZSwitchSetup Administrator's Guide
53-1000607-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae370a - brocade 4gb san switch 4/12

Table of Contents