Task 11: Diagram The Planned Configuration - HP 316095-B21 - StorageWorks Edge Switch 2/24 Planning Manual

Fw v06.xx/hafm sw v08.02.00 hp storageworks san high availability planning guide (aa-rs2dd-te, july 2004)
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Task 11: Diagram the Planned Configuration

Determine peripheral devices that will connect to each director or switch, and
determine whether and where connectivity should be limited (zoning). These
devices may include servers, storage control devices, and other fabric elements in
a multi-switch fabric.
Part of this task may have been performed when the configuration was
determined. It might be helpful to draw the configuration diagram. Indicate
distances in the diagram if necessary. Transfer information from the configuration
diagram to the product planning worksheet provided as part of
Complete the Planning
SAN High Availability Planning Guide
Worksheet" on page 191.
Configuration Planning Tasks
"Task 13:
189

Advertisement

Table of Contents
loading

Table of Contents