DAELIM ET-250 Service Manual page 94

Hide thumbs Also See for ET-250:
Table of Contents

Advertisement

Align the position mark on the shift spindle
sprocket with that of shift drum, and then install
shift spindle.
Position mark
Dowel pins
Install dowel pins and new gasket.
9 bolts
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Install the shift spindle bracket, drive chain
protector, speedometer gear box and gear change
lever.
Add gear oil.
Gear oil quantity: 750c.c.

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for DAELIM ET-250

Table of Contents