Align the position mark on the shift spindle
sprocket with that of shift drum, and then install
shift spindle.
Position mark
Dowel pins
Install dowel pins and new gasket.
9 bolts
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Install the shift spindle bracket, drive chain
protector, speedometer gear box and gear change
lever.
Add gear oil.
Gear oil quantity: 750c.c.