EJHA04AAV3 + EHY2KOMB28+32AA
Daikin Altherma H Hybrid
4P531180-1D – 2025.03
▪
BS 6798: 2014 Specification for selection, installation, inspection, commissioning,
servicing and maintenance of gas-fired boilers of rated input not exceeding
70 kW net
▪
BS 6891: 2015 Specification for the installation and maintenance of low pressure
gas installation pipework of up to 35 mm (R1¼) on premises
▪
BS 7593: 2006 Code of practice for treatment of water in domestic hot water
space heating systems
▪
BS 7671: 2018 Requirements for electrical installations. IET wiring regulations
▪
BS 7074: 1 Code of practice for domestic and hot water supply
▪
EN12828: 2014 Space heating for domestic premises
Potable water: all seals, joints and compounds (including flux and solder) and
components used as part of the secondary domestic water system MUST be
approved by WRAS.
3
General safety precautions
|
Installer reference guide
19
Need help?
Do you have a question about the Altherma H Hybrid EJHA04AAV3 and is the answer not in the manual?