Engine Installation - KYMCO GRAND DINK 125 Service Manual

Hide thumbs Also See for GRAND DINK 125:
Table of Contents

Advertisement

5. ENGINE REMOVAL/INSTALLATION

ENGINE INSTALLATION

Install the engine in the reverse order of
removal.
Tighten the engine mounting bolts.
Torque: 49N-m
Tighten the rear shock absorber upper mount
bolts.
Torque: 39.2N-m
After installation, inspect and adjust the
following:
• Throttle grip free play ( 3-3)
• Fill the rear brake reservoir with brake fluid
and bleed air from the rear brake.
• Fill the cooling system with coolant and
start the engine to bleed air from the
system.
5-5
GRAND DINK 125/150
Engine Hanger Bolt
Rear Shock Absorber Upper Mount Bolts

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grand dink 150

Table of Contents