A Requirements
Mandatory installation requirements, including compliance with regulations and recommended minimum clearances.
B Opening
Step-by-step instructions for opening the Charge Point enclosure using the specified tools.
C Positioning
Guidance for drilling wall holes and positioning the unit correctly for mounting.
D Fixing
Procedure for securely attaching the Charge Point to the wall using screws.
E Wiring
Detailed instructions on electrical wiring, cable glands, and essential protective devices.
F Closing
Steps for closing the unit after installation, including checks on connections and indicator lights.
Need help?
Do you have a question about the ePARK M-2C2 and is the answer not in the manual?
Questions and answers