A. Requirements
Specifies country regulations and recommended minimum distances for usability, maintenance, and safety.
B. Opening
Instructions on how to open the ePARK unit using an allen wrench and specific screws.
C. Positioning
Guidance on drilling the wall for mounting the Charge Point, including drill bit size and measurements.
D. Fixing
Instructions on how to fix the unit to the wall using screws after positioning.
E. Wiring
Details on electrical wiring considerations, including cable glands and protection recommendations.
F. Closing
Steps for verifying and closing the Charge Point after installation, including checks and beacon lights.
Need help?
Do you have a question about the ePARK M-2S2 and is the answer not in the manual?
Questions and answers