Download Print this page

Advertisement

Eaton Green Motion
Green Motion Building and Green Motion Fleet
commissioning guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the GMEV40CMC1B-WC and is the answer not in the manual?

Questions and answers

Summarization of Contents

EV Charge Station Commissioning via Wi-Fi
Commissioning via Wi-Fi
Steps to connect the EV charge station using Wi-Fi network credentials.
EV Charge Station Commissioning via Ethernet
Commissioning via Ethernet
Instructions for connecting the EV charge station using an Ethernet cable for internet.
EV Charge Station Commissioning via Cellular
Commissioning via Cellular
Guide for setting up cellular connectivity with a non-Eaton SIM card.
EV Charge Station in Non-CNM Mode
Operate in Non-CNM Mode
Configure the EV charge station for standalone, non-networked operation.
EV Charge Station Commissioning to Third-Party CNM
Commission to Third-Party CNM
Steps to integrate the EV charge station with external charging management software.
Update EV Charge Station LCD Display Language
Update LCD Display Language
How to change the language displayed on the EV charge station's LCD screen.
EV Charge Station Commissioning Tool Setup and Usage
Install Commissioning Tool
Download and install the Eaton EV charge station Commissioning Tool.
Connect Computer to EV Charge Station
Steps to establish an Ethernet connection between the computer and the EV charge station.
Update TCP/IP Settings
Configure computer's IP settings for communication with the EV charge station.
Log In and Connect Tool
Steps to log into and establish a connection with the EV charge station using the tool.
Password Management
Instructions for changing or resetting the EV charge station's password.