Eaton Green Motion Fleet Pro Installation Manual

Eaton Green Motion Fleet Pro Installation Manual

Hide thumbs Also See for Green Motion Fleet Pro:

Advertisement

Quick Links

Green Motion chargers
Installation guide:
Green Motion Fleet Pro
Scan here for
Spanish translations

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Green Motion Fleet Pro and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eaton Green Motion Fleet Pro

  • Page 1 Green Motion chargers Installation guide: Green Motion Fleet Pro Scan here for Spanish translations...
  • Page 2: Table Of Contents

    Contents PRODUCT INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PACKAGE CONTENTS .
  • Page 3: Product Introduction

    Installation Guide Product introduction Eaton Green Motion Fleet Pro is a 19.2 kW AC Level 2 charger. Green Motion Fleet Pro chargers power plug-in hybrid and all-electric vehicles and are compatible with the Society of Automotive Engineers J1772 charging standard. Green Motion Fleet Pro chargers with robust enclosure enable cost effective deployment and operation of EV charging infrastructure in fleet and industrial settings.
  • Page 4: Routine Operation

    No Blink Vehicle connected Blue Short Vehicle connected, EVSE ready Blue Long Charging Blue No Blink EVSE/EV Fault (1) Long Control Pilot Fault No Blink 1. Refer to the troubleshooting section for help on various faults. GREEN MOTION FLEET PRO www.eaton.com...
  • Page 5: Installation

    YOU CONTACT YOUR ELECTRIC UTILITY TO DISCONNECT POWER TO AN EXISTING LOADCENTER. THE LINE SIDE OF THE MAIN BREAKER IS ENERGIZED UNLESS POWER IS DISCONNECTED UPSTREAM. EATON WILL NOT ASSUME RESPONSIBILITY FOR PROPERTY DAMAGE OR PERSONAL INJURY RESULTING FROM MISUSE OF THE INFORMATION IN THIS PUBLICATION.
  • Page 6: General Reference

    . This equipment should be located at least 18 inches 15” min (460 mm) above the floor . 15” min 10” max 48” max GREEN MOTION FLEET PRO www.eaton.com 15” min...
  • Page 7: A - Preparing The Ev Charger(S)

    This section details the instructions for various installation options . Failure to follow these instructions may result in nonfunctional and/or unprotected equipment . Eaton suggests following the appropriate ADA installation guidelines for commercial applications . CAUTION: Ensure the EV charger’s dedicated 100A upstream breaker handle is in the OFF position.
  • Page 8 . Remove for Keyhole rear entry Remove for bottom entry Reference: • EV charger [A] STEP B-4 Run lineside wiring and ethernet (ethernet is optional) into the wall charger [A], following all local guidelines . GREEN MOTION FLEET PRO www.eaton.com...
  • Page 9 . • SIM card slot is on the bottom side of the SIM card module . Carefully remove the Eaton provided SIM card and insert a new SIM . • Place the SIM card module back into its slot on the printed circuit board .
  • Page 10: C Mount An Ev Charger To A Pedestal

    Only remove second NEMA plug if you intend to connect to Ethernet . panels . Bolts, washers, nuts Top panel Bolt, washer, nut Middle panel NEMA plug (Ethernet) NEMA plug Bolt, washer, nut Bottom panel GREEN MOTION FLEET PRO www.eaton.com...
  • Page 11 • Premium cord holster [D] STEP C-4 Hang charger [A] on mounting plate [C] and insert M4 retention screw . Reference: • EV charger [A] • Mounting plate [C] Retention screw • M4 Retention screw GREEN MOTION FLEET PRO www.eaton.com...
  • Page 12 • 1” plastic nuts [H] - x2 • 1” o-ring [J] - x2 • 1/2” threaded plastic pipe nipple [K] • 1/2” plastic nuts [L] - x2 Reference: • 1/2” o-ring [M] - x2 • EV charger [A] GREEN MOTION FLEET PRO www.eaton.com...
  • Page 13 M6 or ¼’ Stud for AWG# 8 Recommended Lug Suggested part: YAD2CM6E14 Suggested part: YAD8CM6E14 Wire Type Copper Screw Type Torque (lbf-in) 21.7 * Local electric code shall take priority over this recommendation. Electrical Systems supported: 240V Residential, 208V Wye GREEN MOTION FLEET PRO www.eaton.com...
  • Page 14 [S] provided and restore the key [S] at a safe and secure location . Middle panel Lower panel Installation is complete. Turn to page 15 to commission the EV charger. GREEN MOTION FLEET PRO www.eaton.com...
  • Page 15: D Mount A Second Ev Charger To A Pedestal

    Repeat Steps C-4 through screws . C-8 to mount the second EV charger. Use a 1/4”-20 Hex head bolt, neoprene washer, and 1/4”-20 serrated flange nut to secure the lower mounting hole . Washer Assembly Bolt GREEN MOTION FLEET PRO www.eaton.com...
  • Page 16 Turn to page 15 to commission the EV charger. Reference: • Premium cord holster [D] • 1/4”-20 Hex-head bolt [N] - x2 • Neoprene washer [R] - x2 • 1/4”-20 serrated flange nuts [P] - x2 GREEN MOTION FLEET PRO www.eaton.com...
  • Page 17: Fcc

    Connectivity and various other settings are available through the LCD’s ‘ A dministration Menu’ . Default password to access these settings is ‘eaton’ . Users will be required to update to a stronger password . Refer to the product web page QR code to the right for detailed instructions on commissioning the charger using Wi-Fi, Ethernet or cellular and connect to a CPO provider .
  • Page 18: Warranty Information

    For all other Terms and Conditions of Sale, please refer to Eaton’s in conformance with Seller’s recommendations, including as set forth in these Selling Policy 25-000.
  • Page 19: Troubleshooting

    SAE J1772 connector like the one on Eaton EV charger. Please check instructions that came with your car on where to find this adapter or contact your manufacturer. SAE J1772 is a universal charging connector widely adopted by most EV vehicle manufacturers.
  • Page 20 Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton .com © 2023 Eaton All Rights Reserved Eaton is a registered trademark. Printed in USA Publication No . IL191014EN All trademarks are property Rev 01 of their respective owners.

This manual is also suitable for:

Gmev80cme1-wcGmev80cmc1-wc

Table of Contents