Preparing the Rack for Component Installation
This chapter discusses the following topics:
•
Required tools
•
Checking the hardware
•
Removing the rack doors
•
Removing the side panels
•
Stabilizing the rack
— Standalone racks
— Multiple racks
•
Server/Storage vs. switching configurations
HP 10000 Series Rack Reference Guide
3
3-1