Page 1
User and maintenance instructions FlowMaster II rotary driven 220/380–420 V AC, 50/60 Hz, 3 phase electric pump Models 85745 (120 lbs), 85746 (400 lbs) series “A” Date of issue May 2023 Form number 404455 Version...
I, the undersigned of Lincoln Industrial Corporation, do hereby declare that the equipment specified above, in its intended use, conforms to the requirements of the above directives and harmonized standards at the time of placing the above product on the market.
2010:2617) I, the undersigned of Lincoln Industrial Corporation, hereby declare that the equipment specified above, in its intended use, conforms with all requirements of the U.K. legislation Supply of Machinery (Safety) Regulations 2008 No. 1597 by the time of placing it on the market.
Safety * Explanation of signal CAUTION Do not operate equipment without words for safety wearing personal protective gear. The assembly must be installed, maintained Wear eye protection. Protective and repaired exclusively by persons familiar equipment such as dust mask, non-skid with the instructions.
Description Appropriate use Inspection FlowMaster II rotary AC electric pump uses All pump models are exclusively designed If over pressurizing of equipment is believed an AC motor and a two stage planetary to pump and dispense lubricants using elec- to have occurred, contact factory authorized gear drive.
Fig. 1 NOTE Control wiring diagram Motor starter is required along with proper over current protection. Optional vent valve and motor starter coil must have voltage rating as required by system controller. NOTE Overload protection must be provided as required by local codes and regulations.
Fig. 3 Pump dimensions 16.07 in 8.78 in (408 mm) (223 mm) 13.91 in 3.78 in (353 mm) (96 mm) 2.72 in 2.27 in (69 mm) (58 mm) Ø 1.25 in (Ø 32 mm) 4.25 in (108 mm) 2.75 in (70 mm) 6.75 in (171 mm)
Fig. 4 NOTE Pump was tested in lightweight oil left in Typical installation to protect pump from corrosion. Flush pump before connecting it to system to prevent contamination of grease with residual oil. NOTE Typical installation († fig. 4) is only for selecting and installing system components.
Page 10
Table 3 WARNING NOTE Do not exceed maximum stated If it is necessary to drill mounting holes Electric FlowMaster II pump pressure. Install high pressure shut-off into reservoir cover, refer to fig. 3, 380–420 V AC, 50 Hz 19:1 ratio, 2 stage valve (79) rated to 5 000 psi (345 bar).
Operation Crankcase oil service interval • Check oil level after every 750 hours of machine operation, or monthly. WARNING • Change oil after every 2 000 hours of Do not exceed maximum stated machine operation or every year. pressure. Install relief valve to ensure •...
Disassembly 12 Remove shaft adapter (73). 25 Using rubber mallet and piece of brass or 13 Using a pick, remove gear other suitable piece of soft metal, tap on box o-ring (38). crank rod (7) inside housing (37). Pump 14 Loosen screws (44) holding 26 Pull eccentric (5) and crank rod (7) out of shaft cover (46) on pump top of pump housing (37).
Crankrod and 6 Remove steel backup ring (17). 18 Turn tool counter-clockwise to remove 7 Place plunger link rod (20) in a vise. lower bushing and plunger (24) from eccentric 8 Using open-ended wrench, loosen plunger link rod (20). plunger link rod (20) and remove from 19 Remove plunger (24).
Crankrod Fig. 12 1 Using hex head wrench, loosen and remove flat head screws (1) from eccentric (5) († fig. 12). 2 Remove counterbalance weights (2). 3 Remove outer (3) and inner (4) retaining ring from both sides of crank rod (7). 4 Place crank rod (7) on supplied 2 (63,5 mm) diameter steel pipe.
Assembly Pump 14 Apply threadlocker to threads of upper bushing and plunger end (10). 1 Install ball (23) into lower bushing and 15 Thread upper bushing and Crankrod and plunger (24) († fig. 13). plunger end (10) into outlet pin (8). 2 Insert check rod (22) into 16 Torque to 110–125 in-lbf eccentric...
Page 16
31 Slide lower bushing and plunger (24) 41 Insert bronze bearing (56) into NOTE into reciprocating tube (25) with housing tube (60). For ease of installation of lower cup, use o-ring (27) near bottom of 42 Position crankrod assembly (7) over top small piece of tubing to slide lower cup reciprocating tube (25).
Page 17
44 While aligning key (39) on shaft (40) with 56 Install four gear box mounting 67 Install screws (33) with o-rings (34) into eccentric key way (5), slide shaft (40) into screws (69) and washers (70) in gear pump cover (35). eccentric (5) (†...
Troubleshooting Condition Possible cause Corrective action Pump does not run. Pump is seized or damaged. Disassemble pump and repair any parts that are damaged or worn. Incorrectly wired. Check wiring diagram. Pump speeds up or runs erratically. Low level of grease or reservoir is empty. Fill reservoir.
Parts list Item Description Part Quantity Item Description Part Quantity Flat head screw ( -28 x 1 270635 Woodruff key 272560 Counter weight 272197 Pump shaft 277397 Retaining ring 270609 Retaining ring 272561 Retaining ring 270608 Ball bearing 272556 Crank eccentric 270666 Shaft seal 272554...
Repair kits Tool and consumable list Kit number 275186 in open end wrench in open end wrench Item Description Part Quantity in open end wrench 12 in adjustable wrench O-ring (nitrile) 34255 in hex head wrench Upper bushing and plunger 275000 in hex head wrench Backup washer...
Need help?
Do you have a question about the SKF FlowMaster II and is the answer not in the manual?
Questions and answers