Intel
Entry Server Chassis SC5295-E
®
UP/DP/WS/BRP
Quick Start User's Guide
Thank you for buying the Intel
®
Entry Server Chassis SC5295-E.
The following information will help you to prepare your chassis
for integration with your selected Intel
Server Board.
®
These guides and other supporting documents (including
a list of supported server boards) are located on the web at
http://support.intel.com/support/motherboards/server.
If you are not familiar with ESD (Electrostatic Discharge) procedures used during system
integration, please see the Intel
®
Entry Server Chassis SC5295-E User Guide, available on
the CD or at
http://support.intel.com/go/serverbuilder.
Warning
Read all caution and safety statements in this document before performing any of the instructions. Also see the Intel
Chassis Safety Information document at:
http://support.intel.com/support/motherboards/server/sb/cs-010770.htm
Warning
Caution
Installation and service
Observe normal ESD
of this product to be
(Electrostatic Discharge)
performed only by
procedures during
qualified service personnel to
system integration to avoid
avoid risk of injury from
possible damage to server board
electrical shock or energy hazard.
and/or other components.
4
Install CD-ROM or DVD-ROM Drive
2
1
1
Remove the EMI Shield from the
5.25-in Device Drive Bay.
2
Move latch to the "unlock" position.
Insert CD-ROM or DVD-ROM drive
3
into Device Drive Bay until it is
in position.
4
Move latch to the "lock" position.
Connect power and data cables to
5
the rear of the CD-ROM or DVD-ROM
drive.
7
Remove PCI Card Guide
1
Press in on two blue
tabs.
2
Pull PCI Card Guide
outward and
remove from
chassis.
2
Intel is a registered trademark of Intel Corporation or its subsidiaries in the United States and other countries. * Other names and brands may be claimed as the property of others. Copyright © 2005, Intel Corporation. All rights reserved.
Server Board and Server
®
for complete safety information.
Tools Required
Intel® Server Board Guide
Product Code
Intel® Server Board
SC5295UP
SE7230NH1-E
SC5295DP
SE7320EP2, SE7520BD2
SC5295WS
SE7525RP2
Phillips*
Anti-static
screwdriver
wrist strap
SC5295BRP
SE7320EP2, SE7520BD2
5
Install Floppy Drive
5
4
3
2
8
Install Server Board
Note: The SC5295UP version of the Entry Server Chassis
SC5295-E does NOT have any CPU ducts to remove or
1
Remove the small duct (one screw).
install. You will only need to remove and install CPU ducts
IF you have a SC5295DP, SC5295WS, or SC5295BRP.
2
Remove the large duct (two screws).
Part A: Remove CPU Ducts
Note: The CPU ducts must be removed prior to
installing the server board.
Note: Save these
screws.
1
Large
Duct
2
1
Small Duct
Building Value With Intel
Server Products, Programs and Support
Get the high-value server solutions you need by
Intel
®
ServerBuilder is your one-stop shop
taking advantage of the outstanding value Intel
for information about all of Intel's Server
provides to system integrators:
Building Blocks such as:
• High-quality server building blocks
• Product information, including product
• Extensive breadth of server building blocks
briefs and technical product
• Solutions and tools to enable e-Business
specifications
• Intel
Server Management
• Sales tools, such as videos and
®
• Comprehensive training services
presentations
• Worldwide 24x7 technical support
• Training information, such as the Intel
[AT&T Country Code + 866-655-6565]
1
Online Learning Center
• World-class service, including a three-year
• Support Information and much more
limited warranty and Advanced Warranty
Replacement
1
For more information on Intel's added-value
1
Available only to Intel
Members, part of the Intel
server offerings, visit the Intel
®
ServerBuilder
website at:
www.intel.com/go/serverbuilder
2
Remove Front Bezel Assembly
3
3
1
3
3
1
2
1
Disengage two bezel tabs from leftside of chassis.
2
Rotate left side of front bezel assembly outward slightly.
3
Disengage three bezel clips that attach the right side
of the bezel to the right side of the chassis and remove.
5
1
Remove the EMI Shield from
the 3.5-in Device Drive Bay.
2
Move latch to "unlock" position.
4
3
Insert floppy drive into Device Bay
1
until it is in position.
4
Move latch to the "lock" position.
5
Connect power and data cables to
the rear of the floppy drive.
Part B: Install Server Board
Part C: Install CPU Ducts
See your Intel® Server Board Quick Start
User's Guide for server board installation
instructions and installation of the back panel
I/O shield.
DO NOT USE with a Passive Thermal Solution or the
Use the mounting screws, bumpers and
Intel
standoffs (if necessary) that came with your
chassis to secure the server board to
the chassis.
1
Open the Intel
Server Board box. Follow the
®
2
instructions in the enclosed Intel
Server
®
Board Quick Start User's Guide and return
to this document when finished.
1
Remove Side Cover
1
®
1
Channel Program
®
®
e-Business Network.
1
Remove two shipping screws.
2
Push in latch.
3
Slide side cover rearward and remove.
Remove Hard Drive Cage
1
Loosen thumb screw and remove
hard drive cage EMI shield.
2
Remove shipping screw.
3
Push the blue plastic
release mechanism
upward to unlatch the
3
hard drive cage.
4
Once released, pull the
hard drive cage out of the
chassis.
1
2
6
Remove System Fan
1
3
1
1
Press two bracket tabs outward and remove
system fan.
This duct should only
be used with Active
Only required for Intel
®
Server Boards
Thermal Solutions.
SE7320EP2 and SE7525RP2:
3
Lower the small CPU duct into chassis and line
®
Workstation Cooling Kit.
up with mounting hole in chassis.
Note: Tab on small CPU duct must engage
Lower the large CPU duct into chassis and line
corresponding opening in large CPU duct.
up with two mounting holes in chassis.
4
Attach to chassis using the single screw you
Attach to chassis using the two screws you saved
saved from Part A.
from Part A.
Tab
engages
here
Server
Board
2
3
4
Need help?
Do you have a question about the SC5295DP and is the answer not in the manual?
Questions and answers