Download Print this page

enphase IQ Battery 10C Quick Install Manual page 27

Advertisement

11. Closing and energizing the unit
This section provides step-by-step instructions for closing and energizing the IQ Battery 10C unit. It covers the process of securing
the wiring cover, connecting battery DC connectors, attaching the cover assembly, and connecting the control switches. Follow the
outlined steps carefully to ensure proper installation and operation of the unit, while adhering to the specified torque requirements
and safety precautions.
11.1 Closing the wiring cover
1. Tilt the wiring cover.
1
2. Slide the wiring cover under the latches.
2
3. Fasten the four encircled captive screws to close and secure the wiring cover (torque to 19.5 in-lb or 2.2 N m).
3
EN-27

Advertisement

loading
Need help?

Need help?

Do you have a question about the IQ Battery 10C and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Iqbattery-10c-1p-na