CETECOM Inc.
Test report no.:EMC_381EN489-17_2002
2
Technical test
2.1
Summary of test results
No deviations from the technical specification(s) were ascertained in the course of the tests
Final Verdict:
(only "passed" if all single measurements are "passed")
Technical responsibility for area of testing:
2003-01-10
EMC & Radio
Date
Section
Responsible for test report and project leader:
2003-01-10 EMC & Radio
Date
Section
Issue date:2003-01-10
Performed
Lothar Schmidt (Manager)
Name
Philip Kim (EMC Engineer)
Name
Page 4 (25)
Passed
Signature
Signature
Need help?
Do you have a question about the F5D7010CE2 and is the answer not in the manual?