Download Print this page

NEC READY ES PRO Service And Reference Manual page 21

Hide thumbs Also See for READY ES PRO:

Advertisement

Align the notched corner of the processor with the pin 1 corner of the socket. Insert the processor into the
socket.
Figure -13 Aligning the Processor and Socket
Swing the socket lever up to lock the processor in the socket.
Replace the heatsink by positioning the clamp openings over the socket tabs.
Figure -14 Replacing the Heatsink
Be sure the jumper settings are set correctly for the upgrade processor (see Appendix C).
Replace the power supply.
Reconnect any power supply cables you disconnected.
Secure the power supply with the four screws.
Replace any expansion boards that were removed earlier.

Advertisement

loading