TPSM82821EVM-080, TPSM82822EVM-080 and TPSM82823EVM-080 Evaluation Modules
1 TPSM82821EVM-080, TPSM82822EVM-080 and TPSM82823EVM-080 Evaluation
Modules
These EVMs ship as the Revision B, the newer revision provides better thermal performance, smaller
solution size and complies with CISPR 11 Class B. The TPSM8282xEVM-080 facilitates the evaluation of the
TPSM82821, TPSM82822 and TPSM82823 1-A, 2-A and 3-A pin-to-pin compatible step-down module with
DCS-Control in a 2-mm × 2.5-mm uSiL package. The EVMs have a 1.8-V output voltage with 1% accuracy for
input voltages from 2.4 V to 5.5 V with a maximum solution height of 1.1 mm. The TPSM82821, TPSM82822
and TPSM82823 are highly efficient and small solutions for point-of-load (POL) modules in applications, such as
optical modules, embedded camera systems and other space-limited applications.
2 Introduction
The TPSM82821, TPSM82822 and TPSM82823 are synchronous, step-down converter power modules in a
small 2-mm × 2.5-mm uSiL package. The three different devices of this family support 1 A, 2 A or 3 A output
current.
2.1 Performance Specification
Table 2-1
provides a summary of the TPSM8282xEVM-080 performance specifications.
SPECIFICATION
Input voltage
Output voltage setpoint
Output current
2.2 Modifications
The printed-circuit board (PCB) for this EVM is designed to accommodate both the adjustable output voltage
versions of this module. Additional input and output capacitors can also be added.
2.2.1 Input and Output Capacitors
C5, shown in
Figure
7-1, is provided for an additional input capacitor. This capacitor is not required for proper
operation, but can be used to reduce the input voltage ripple.
C6 and C7 are provided for additional output capacitors. These capacitors is not required for proper operation
but can be used to reduce the output voltage ripple and to improve the load transient response. The total output
capacitance must remain within the recommended range in the data sheet for proper operation.
2
TPSM82821EVM-080, TPSM82822EVM-080 and TPSM82823EVM-080
Evaluation Module
Table 2-1. Performance Specification Summary
TEST CONDITIONS
TPSM82821EVM-080
TPSM82822EVM-080
TPSM82823EVM-080
Copyright © 2021 Texas Instruments Incorporated
MIN
TYP
MAX
2.4
5
5.5
1.8
0
1
0
2
0
3
SLVUBR5C – AUGUST 2019 – REVISED APRIL 2021
Submit Document Feedback
www.ti.com
UNIT
V
V
A
A
A
Need help?
Do you have a question about the TPSM82821EVM-080 and is the answer not in the manual?
Questions and answers